By Aaron Hurlburt · Last reviewed 2026-10-17
From lease signing to the first Monday in the new space: what to do and when, what your building will ask for, and how to keep phones and computers working.
Most office moves don't fail on move day. They fail weeks earlier, when nobody booked the freight elevator, the internet install got scheduled for the wrong week, or the new building wanted a certificate of insurance the mover never sent. A simple timeline fixes most of that.
Pick one person to own the move. Give them authority to make decisions and a list of who to ask about what. Get the new floor plan and decide where people and equipment go.
Call your internet and phone providers now. New circuits in commercial buildings can take weeks, and this is the item that most often delays an opening. Ask your IT vendor to plan the network move at the same time.
Request moving quotes. For anything bigger than a few desks, the mover should do a walkthrough of the current space before giving you a price.
Choose your mover and get the scope in writing: crew size, trucks, disassembly and reassembly of workstations, crating, after-hours timing and disposal of anything you're not taking. Ask for their Florida registration with FDACS.
Ask both buildings for their move rules. Downtown Tampa and St. Petersburg towers often limit moves to evenings or weekends and require elevator reservations, floor and wall protection and a certificate of insurance naming the landlord and management company.
Decide what isn't coming. Old furniture, dead printers and file boxes cost money to move. Book a commercial junk removal crew to clear them out before move week.
Order new furniture if you need it, and confirm delivery dates land after the move, not before. Update your address with clients, vendors, banks and your Google Business Profile, timed to go live on move day.
Send the mover's certificate of insurance to both buildings and confirm they've accepted it. Reserve elevators and loading docks in writing.
Give staff a packing date and a color-coded labeling system that matches the new floor plan.
Back up servers and critical files. Shut down and label IT equipment the way your IT vendor tells you. Have the move owner on site at both locations, or one person at each.
Walk the old space with your landlord when it's empty. Photos protect your deposit. Do the same in the new space before furniture arrives, so any existing damage is documented.
Plan for a day or two of small problems. A printer won't connect, a desk lands in the wrong room, a box of cables goes missing. Keep the mover's crew lead's number handy and ask whether a short return visit is included for adjustments. Many movers will come back to shift a few pieces if you ask up front.
Walk every room with your floor plan on day one and list what's missing or damaged. Most movers have a short window for reporting damage, so check the paperwork and report it in writing quickly, with photos.
Then close out the old lease. Return keys and access cards, confirm the final meter readings, cancel services at the old address and get the landlord's walkthrough notes in writing.
If you're moving inventory, racking, machinery or medical equipment, you need a commercial mover with the right equipment and experience, and often a phased plan so operations keep running. Some equipment has to be disconnected or recalibrated by the manufacturer's technician, so get those visits on the calendar early.
Line up office movers, network cabling and business phone systems early, since those crews book out at month end. If the new space needs work first, commercial build-outs and commercial painting should finish before the move date, not the same week. Look up each vendor on Sunbiz before you sign.
Ninety days is comfortable for most small and mid-size offices. Start with internet and phone service, which can take the longest.
Yes. Most office movers work evenings and weekends, and many downtown buildings require it.
Usually a certificate of insurance, an elevator reservation and a scheduled move window. Ask your property manager.